Fire stopping for office to flat conversions
An open-plan office floor becomes ten flats, and every new wall needs to be a fire wall.
- Every seal labelled and photographed
- BM TRADA / FIRAS-certificated contractors
- Written price before any work
A good number of Reading's office blocks have been turned into flats over the last decade, many of them near the station and the town centre. An office floor was designed as one big space with a suspended ceiling, a raised floor and a couple of risers in the core. Turning it into eight or ten flats means building new walls between them, and every one of those walls has to separate one home from the next in a fire.
That is where conversions tend to go wrong. The new plasterboard walls between flats are often built up to the suspended ceiling and stop, leaving the void above running across the whole floor. Smoke from a kitchen fire in one flat can travel over the top into its neighbours. The fix is either to take the walls up to the slab and seal the head of the wall, or to put cavity barriers in the ceiling void on the line of each wall.
Then there are the new services. An office has toilets in the core. Flats need a kitchen and a bathroom each, so new soil pipes, wastes and extract ducts are cut through the concrete floors all over the building. Each of those holes needs a collar, a wrap or a tested seal. Raised floors hide the same problem underneath: cables and pipes running from one flat to the next under the floor tiles.
If you own or manage a converted block, look above a ceiling tile in a flat corridor and see whether the walls carry on up. Our BM TRADA / FIRAS-certificated contractors can survey and seal the rest.

Send the postcode, the type of building and a photo of the gap with a tape measure in the shot. We reply with what it needs and a written price.